Before comparing projected energy improvements, ask what each audit provider will measure and how it will define the starting point. A useful proposal connects the building, meters, operating conditions and intended decisions. This worksheet organizes the measurement conversation. It does not certify an audit method, establish regulatory compliance or predict savings from a project that has not been evaluated.
Set the measurement boundary
List the building areas, utility accounts, on-site generation and tenant arrangements relevant to the review. Note shared meters and missing periods. Ask whether the proposed work evaluates the whole property, a specific system or selected operating hours. Those boundaries can materially change the interpretation of a result. Have the facilities or energy professional explain the appropriate approach; the buyer should document the agreed scope rather than combine unlike readings into a convenient total.
Ask how the baseline will be built
The Department of Energy’s commercial-building performance guidance discusses consistent metric definitions, data procedures and analysis tailored to project boundaries. Use that context to request the provider’s data sources, treatment of gaps and assumptions about operations. Ask how weather, occupancy or schedule changes will be described when relevant. Distinguish measured consumption from modeled estimates. A clear explanation of assumptions supports review, while a single percentage without a reproducible starting point is difficult to evaluate.
Worked example: one meter, two tenants
A hypothetical owner wants an audit of a production area but its utility meter also serves a neighboring tenant. One provider proposes a whole-meter trend review; another includes temporary submetering of the production equipment. The buyer records those as different scopes and asks its technical reviewer which can support the intended equipment decision. The worksheet does not declare either method universally superior or imply a particular amount of achievable savings.
Define the decision-ready output
Ask for a list of observed conditions, data limitations, proposed next investigations and the basis of any estimated result. Separate a screening opportunity from an engineered implementation plan. Identify who will answer technical questions after the report and whether later measurement is included. At acceptance, check that the report uses the agreed boundary and identifies missing evidence. Cost, feasibility and safety decisions may require additional qualified review before any physical changes are made.
Bring this to the conversation.
- Building and meter boundaries mapped
- Measured data separated from modeled assumptions
- Missing periods and operating changes explained
- Report limitations and next technical decisions visible
Questions worth asking.
- What question can this measurement plan actually answer?
- Which loads are outside the proposed boundary?
- How can our reviewer reproduce the baseline?
- Which missing meter readings would materially limit the report, and how will those limitations be communicated to management?
Turn the discussion into a next step.
Ask for a written action list that identifies what should happen, who is responsible, and when the team should review the result. Keep supporting documents with the decision so the books, payroll, and return preparation can follow the same facts.
AE Tax Advisors presents this resource library. To discuss scope and fit for your own business, book a discovery call. Directory inclusion is separate from purchasing services.
Reference and applicability.
DOE supplies commercial-building measurement context; the worksheet makes no savings or compliance claim. This worksheet is original editorial guidance.. Source checked 2026-11-20. The checklist and meeting agenda are editorial preparation tools, not an IRS-prescribed procedure. Tax treatment, elections, and deadlines depend on the facts and applicable law. This page does not establish an advisory relationship.